The conditions that effect cure are as follows but are not limited to:
- Air and surface temperatures
- Humidity
- Moisture content of the concrete is too high for product recommendation.
- Conditions effecting cure due to improper mixing and/or application but not limited to:
- Not mixing each of the components separately before mixing together.
- Not mixing the components together or leaving one of the components out.
- Not mixing the correct product together.
- Not allowing proper induction or sweat times (if applicable).
- Coating film is too thick.
- Stir sticking vs. mechanically mixing.
- Turning the mixing bucket upside down near the end of the coating to let all the product drip out.
- Old product that has been stored. Is the product within its shelf life and how has it been stored if not newly purchased? Don’t mix old material with new if over 6 months old and/or it has been through a freeze.
ReplyDeleteThe equipment to make plastic blown film thickness has not changed significantly in recent years and used plastic blown film lines offer a high return on investment.
If buying by component, ensure the width and thickness of the film matches the rate of the existing system.
Please visit: film thickness